overview

       The project management system solution for builders, owners and investors of Jumi Technology is a scenario product centered on "construction projects", which improves construction efficiency by reshaping the boundaries of project organization, coordinating internal and external resources of the enterprise, empowering participants in project construction, and becoming good builders. The system is mainly characterized by "data, platform, ecology, connection, empowerment, and efficiency", and is positioned as a project management system in the digital and intelligent era. The system focuses on the improvement of "efficiency" in the project management process, and focuses on the precipitation, accumulation and reuse of "data". Create a cross-regional and cross-organizational project collaboration platform for large enterprise groups; a project management platform that can be seen, managed, and retained; An efficiency improvement platform for project communication, project collaboration, and project control; a data integration platform for the whole process and all-element management of the project; An ecological cooperation platform that connects and empowers project participants, realizing the organization online, communication online, collaboration online, business online and ecological online for project management of large enterprise groups.
       The project management system solution of Jumi Technology has served Huawei, Vanke Group, CP Group, Zhongtong Group, Botao Group, JD Group, Haida Group, Baosheng International Group, Xishan Coal and Power Group, Dashenlin Group, Huainan Mining Group, Lianyungang Industrial Investment Group, Yitai Group, Longsheng Group, Runji Group, Taihua Group, HNA Group and other nearly 100 customers, these customers are the world's top 500 enterprises or listed companies.

Customer positioning

        A large enterprise group, with multiple subsidiary companies, its main business is not engineering construction, but in order to expand its main business, It is necessary to carry out new construction, reconstruction, expansion, and relocation of production facilities and operating facilities, maintenance and technical transformation of large equipment, and external equity investment and other business activities. Corresponding infrastructure department, infrastructure department, investment department, planning department, planning department, project management center, project management department, engineering management section and other functional departments.

Business pain points
Solution architecture

1.Empowerment and efficiency:improvement: Empower construction managers, project managers, design supervisors, procurement supervisors, cost supervisors, engineering supervisors, quality and safety engineers, and document engineers to improve cross-organizational, cross-departmental and cross-professional collaboration.

2.Build core operational capabilities:build approval and construction capabilities, design management capabilities, procurement management capabilities, on-site construction management capabilities, planning and schedule control capabilities, budget and cost management capabilities, and QHSE management capabilities.

3.Form a development and innovation ecology:hrough the reshaping of enterprise organizational boundaries and sharing digital services, subcontractors and suppliers can be included in the platform, forming an ecology, and forming an open innovation ecology.

4.Improve service experience and bring revenue growth:Improve service experience and bring revenue growth: Provide high-quality, online and transparent engineering construction services centered on internal customers (user departments) to help the company improve production capacity and revenue growth.

Functional architecture

1.Platform operator:The platform is privatized and deployed, and the multi-tenant structure can be included in this platform through enterprise settlement and review, and the project construction can be coordinated and completed through enterprise settlement.

2.Project management best practice library:including business component library, business process library, data template library, and standard specification library for multiple industries and different project types.

3.Business scenario configurator:configure different business components, business processes, data templates and standards for different project types, and if it is not enough, you can expand the development platform and expand the development to achieve a platform and N types of applications.

4.Access layer:portal, PC, APP, and third-party system interface integration, including personal center, role center, business center, collaboration center, and project center.

Core values
  • A project management platform that can be seen, managed, and retained
    1)Visible:Through the project management cockpit, digital large screen, video surveillance, BIM+, and automated periodic reports, the decision-making level and management can see the implementation of the annual investment plan, as well as the progress, investment, quality, safety, problems and risks of single projects, multiple projects, project groups, and project portfolios.
    2)Manageable:Based on goal management and cybernetics, it realizes effective control of project planning and schedule, budget and cost, quality and safety, changes and visas, and monitors and warns of project progress, investment, quality, safety, documentation, problems and risks.
    3)Keep:Through the project database under implementation, the historical project database after the project closure, and the project management best practice database summarized and extracted, a total of 3 databases are used to accumulate and reuse project data.

  • An efficiency improvement platform for project communication, project collaboration, and project control
    1)Improvement of project communication efficiency:roject participants discuss and communicate online with business objects such as schedules, contracts, drawings, models, and changes, including text, on-site pictures, voice, video, online meetings, documents, and three-dimensional models, and the communication process records are permanently stored.
    2)Efficiency improvement of project collaboration:Efficiency improvement of project collaboration: with the project as the main line, the plan as the leader, and the task-driven, through key chain project management, find business bottlenecks, solve blockages, increase project liquidity, and achieve orderly and efficient collaboration across organizations and departments.
    3)Efficiency improvement of project control:Through hierarchical and hierarchical management of planning, rolling planning, interface planning, through quality and safety PDCA cycle, and through project document control, the transmission of data and information is transformed from traditional offline transmission to online, effectively improving the efficiency of project control.

  • A data integration platform for the whole process and all-element management of the project
    The project management system is essentially a project-oriented system that integrates, connects, pulls, and aggregates data with the existing IT system of the enterprise. The core task is to "take the project as the main line to guide, coordinate, and task-driven, and realize that project data and information are guided by the project stage, Transmit and flow in various professional systems according to project tasks, avoid information silos, and improve collaboration efficiency. These systems include: ERP system, procurement system, OA system, BPM system, MDM system, financial system, fund payment system, enterprise network disk, contract and legal management system, budget system, enterprise WeChat, DingTalk, Feishu system, etc.

  • An ecological cooperation platform that connects and empowers project participants
    With the project as the carrier and the portal as the entrance, enterprises in the upstream and downstream industrial chain (such as consulting companies, designers, supervisors, and subcontractors) are included in the platform, and through enterprise registration and settlement, from internal collaboration to external collaboration, and an ecosystem is built. Business scenarios of external collaboration include: cross-organizational multi-level and multi-level planning and schedule control, online document sending and receiving, online design collaborative management, online bidding, online quality and safety problem rectification, online change visa approval management, online output value filling and payment application, etc.

Application benefits
  • The efficiency of annual investment plans and project approval has been increased by 40%
    Huainan Mining Group, Yitai Group, Xishan Coal and Power Group and other customers, groups, subsidiaries, and secondary units on the preparation, approval and issuance of annual investment plans have changed from offline to online efficient collaboration, and the project has increased by 40%.

  • The efficiency of project compliance audit and post-project evaluation has increased by 60%
    Customers such as Huainan Mining Group, Yitai Group, Xishan Coal and Power Group, and Zhongtong Group have realized the digital management of the whole process and all elements of the investment project, and the efficiency of the financial audit department's compliance audit and post-project evaluation of the project has increased by 60%

  • Plan achievement rate increased by 10%
    Customers such as Vanke Group, Zhongtong Group, Fuyao Glass Group, and Huawei Infrastructure have significantly shortened the project period through planning and schedule control, as well as multi-level and multi-layer planning coordination. The project plan completion rate has increased from 70% to 85%, an increase of 15%.

  • Cost reduction of 5%
    Baosheng Group, SUMEC Group, JD Five-Star Group, Haida Group, CP Group and other customers effectively control project costs through estimation, budget estimate, budget management, contracts, change visas, and settlement management. The cost of a single project has been reduced by more than 5%.

  • The quality and safety management level has increased by 15%
    Customers such as JD Five-Star Group, Ping An Bank, Haida Group, and Zhongtong Group have reduced safety accidents and improved on-site management capabilities through quality and safety inspections and rectification of non-conformities on the APP side, and the quality and safety management level has increased by 15%.

  • Increase collaboration efficiency by 15%
    Customers such as Huainan Mining Group, Yitai Group, and Xishan Coal and Power Group have realized the whole process, all elements, all participants, and all scenarios from investment planning, project approval, design, procurement, construction and handover, and the overall collaboration efficiency has been improved by 15%.

Data source: PMI (American Project Management Association) on the application effect evaluation index of project management system and the application effect of Jumi Technology's XPM+ platform in typical customers (2012~2023).

Functional module - process dimension
Functional module - management dimension
  • Project planning and schedule control
    Standard task library, plan template, preparation and approval of key milestone plans, general control plans, special plans, multi-level plan linkage, task push, task execution and feedback, progress monitoring and early warning, plan adjustment and progress assessment.

  • Functional planning and schedule control
    Standard task library, plan template, preparation and approval of functional plans, task push, task execution and feedback, progress monitoring and early warning, plan adjustment, and progress assessment.

  • Project bill of quantities management
    The completion of the project bidding bill of quantities, project contract bill of quantities, and project project list is filled, reviewed, and confirmed, and the output value of the project is summarized and counted.

  • Project contract management
    Contract entry and review, contract ledger, contract change, supplementary agreement, contract claim, contract claim, contract reward and punishment, contract termination, suspension, restart, contract settlement, contract closure checklist, contract closure.

  • Project contract payment management
    Contract payment node confirmation, contract bill of quantities filling and confirmation, contract payment node ledger, contract bill of quantities payment ledger, contract payment application, no contract payment application, payment request ledger, invoice receipt.

  • Project funding plan management
    Contract payment nodes, bill of quantities and project schedule are bound, project monthly capital plan, company monthly capital plan, project annual capital plan, company annual capital plan, company annual capital plan.

  • Project budgeting and cost control
    Project cost account, project cost worksheet template, project cost account and project cost worksheet definition, project estimate, budget preparation and approval, project actual cost collection, project cost overrun warning.

  • Project document management
    Project document catalog and document template, drafting, approval, distribution, reception, borrowing, archiving, query and retrieval, authorization, downloading and version management of project documents, online document co-compilation, project document control list.

  • Project quality management
    Quality planning, quality standard library, quality inspection template, quality inspection plan, quality inspection (APP side), rectification of non-conforming items, statistical analysis.

  • Project safety, environment, occupational health management
    HSE inspection template, construction start filing, dangerous projects, safety education, safety inspection, hidden danger rectification, machinery and equipment, special operators, emergency, accident report, safety punishment, work ticket, team morning shift meeting, etc.

  • Project inspection management
    Project inspection template, project inspection plan, project inspection, project inspection ranking, rectification of quality non-conforming items, rectification of potential safety hazards.

  • Project communication management
    Project address book, announcements, news, notices, work contact lists, meeting management, meeting minutes, meeting resolution item tracking, document receipt management, document issuance management.

  • Project issues/requirement management of matters to be coordinated
    Propose, solve and close problems (matters to be coordinated), problems (matters to be coordinated), problems (matters to be coordinated) and the transformation of risks, and problems (matters to be coordinated) are precipitated into lessons learned.

  • Project risk management
    Risk list template, risk identification, risk monitoring, risk lifting, plan delay, cost overrun, personnel overload, quality and safety risk early warning settings.

  • Project change management
    Contact form, change form, visa form, project plan change, project budget change, project deliverable change, project personnel change, project change resume.

  • Project phase, status management
    Project stage template, project phase definition, project phase review, project node review, project start, project pause, project restart, project termination.

  • Lessons learned
    Horizontal expansion matrix of lessons learned, precipitation and approval of lessons learned, horizontal expansion of lessons learned, query of lessons and lessons library, and intelligent push of lessons learned.

  • Project set and portfolio management
    Project sets, portfolio definitions, project prioritization, project project collections, and portfolio data analysis.

  • Project periodic reports
    Definition of periodic report elements, setting of periodic report templates, and automatic generation, sending, and viewing of periodic reports.

  • Project management cockpit
    Global Kanban, multi-project/project group, project portfolio, single project Kanban, project progress, investment, contract, quality, safety, project documentation special Kanban, project approval quotation, design, procurement, construction, acceptance, problem and risk special Kanban.

  • Business component library
    PC business components, APP business components, custom component libraries, project progress management business components, project cost management business components, project quality management business components, project document management business components, etc.

  • Business Process Libraries
    Business process mapping, business process release, project delivery visualization, data flow automation, project delivery bottleneck identification.

  • Standard specification library
    Classification of standards and specifications (country, industry, enterprise), upload of standards and specifications, query and retrieval of standards and specifications, borrowing of standards and specifications, and invalidation of standards and specifications.

  • Historical project database
    Historical project progress, cost, quality, safety, contract, document and other databases, query, retrieval and reuse of historical project data.

  • Data template library
    Project role template, project stage template, project plan template, expense account template, drawing document catalog template, project quality inspection template, project safety inspection template, project inspection template, contract template, etc.

  • BIM+
    Integrated BIM engine, lightweight browsing of BIM models, and integration with project schedule, cost, and document data

  • APP端
    Approval to be to-do, responsibility, message notification and early warning, task push, progress feedback, quality inspection, photography, rectification, safety inspection, photography, rectification, attendance check-in and sign-in of project department and subcontractor personnel, project center and cockpit data viewing.

Interfaces and integrations
  • XPM-Gateway

  • Unified identity authentication

  • Integration with OA systems

  • Integration with ERP, financial
    systems

  • Integration with MDM
    systems

  • Integration with HR systems

  • Integration with archival systems

  • Integration with the procurement SRM
    system

  • Integrate with enterprise WeChat,
    DingTalk, and Feishu

  • Integration with safety management
    systems

  • Integrate with asset management
    systems

  • User roles
    • Responsible for leadership

    • Strategic Planning Division

    • Investment Planning Division

    • Engineering Management Department

    • Design Management Department,Design Institute

    • Purchasing department or bidding company

    • Infrastructure Department

    • Equipment Management Office

    • Contract Legal Office

    • Financial Audit Office

    • Quality and Safety Department

    • General Archives

    • Secondary units

    • Project company

    • Design unit

    • Supervision unit

    • General contractor

    • Subcontractors

    Customer Stories
    Solution download

    Download

    Contact number: 18802102160 Contact email: heshui.kang@jumipm.com Company address: Room 1101, No. 939 Jinqiao Road, Pudong New Area, Shanghai (Jinqiao Road Station, Line 6)

    CopyRight©2015 Shanghai Jumi Information Technology Co., Ltd. All Rights Reserved.Shanghai ICP Preparation No. 15039590  备案图标.pngShanghai Public Network Security No.31011502008063


    聚米科技二维码.jpg

    Official WeChat public account